NORFOLK SQUARE
square meters
A 23.0m gantry was required for the front elevation with further localised beam supports to bare weight of the hoist which was set off gantry. The extreme height of the building provided us with our single biggest challenge. Installing scaffold ties for the temporary roof which had to be high enough to accommodate the newly constructed floor was something we had done before and allowed us to rise to the task.
Texo Scaffolding Operations Director