OTHER TEXO JOBS
STRAND BRIDGE HOUSE
square meters
With the rest of the property being occupied by tenants and a high density of London traffic and footfall, health and safety issues occupied a great of our planning.
The rear elevation was installed off a designed cantilever truss from the fourth floor and above. A 28.0m gantry was added to the Strand elevation supporting a passenger hoist off gantry and a beam hoist at one end of the gantry.
A pedestrian management and exclusion zone was set up after consultation with local authorities and the client.
Texo Scaffolding Operations Director