Project

Redington House

Redington House, Collier St, Kings Cross
Client
Job cost
£1.27million
JOB DURATION
52 weeks
Redington House is a fully occupied tenant block. Due to these circumstances Texo were required by the clients, to erect the access scaffold with minimal disruption to tenants.

Redington House was in a state of disrepair, we were required to erect the scaffolding in a short time period, therefore the stress on Health & Safety was put to a maximum, also having to deal with tenants complaints and aggrievances at the same time.

The scaffold was a fully boarded scaffold to an 8 storey block, with full design.

"It has been a very challenging project with regards to Health & Safety, as well as co ordinating the hoist operatives, but we overcame all challenges, and the client is delighted with Texo's performance"
Jay Thorn
Texo Contracts Manager